*

Baker's Marketplace Lands at 204th and Q. What's Filling In Around It This Winter?

November 5, 2026
Do you want content like this delivered to your inbox?
Late-autumn light on a newer gabled home with pale siding, limestone accents, a recessed oak entrance and a dormant front lawn.

Baker's set the opening of its first Baker's Marketplace in the Omaha area for 8 a.m. Wednesday, November 4, at the corner of 204th and Q Street. That corner is still only partly built. The $40 million, 123,000-square-foot store sits on the grocery lot of a plan the City of Omaha reviewed in late 2024. That plan surrounds a grocery store and fuel station with shops, restaurants and apartments. The grocery store is the first of those pieces to get an opening date, and restaurants are going up on the lots in front of it.

The new businesses all use 205th Street addresses, and that matters if you're figuring out how to drive in. Baker's is at 5010 S. 205th St. Panda Express is going up at 4815 S. 205th St., and Chick-fil-A is under construction at 5121 S. 205th St. These businesses grew up while the road to them was closed. Q Street from 192nd to 204th was shut for reconstruction in April 2025 and only partly reopened in October 2026.

What Baker's Built for Its First Marketplace

Baker's has run regular grocery stores in Omaha for years. The Marketplace is a larger format with more departments. According to the Omaha World-Herald's report on the opening, the Elkhorn-area store includes:

  • Fresh produce, a meat and seafood counter, and a bakery
  • A deli with sushi
  • A Murray's Cheese Shop
  • A Starbucks
  • Expanded pharmacy services with private consultation rooms and a drive-thru
  • Apparel plus home and lifestyle merchandise
  • Online shopping with pickup and delivery
  • A fuel center

The World-Herald reported that the store represents more than $40 million in investment and will create more than 300 jobs. Grow Omaha reported that the store expected to hire 85 full-time and 185 part-time employees. The company chose this corner for its first Marketplace in the market, and the spokesperson spoke about it that way. Baker's spokesperson Sheila Regehr told the World-Herald:

"There's something special about opening the doors to a new store for the very first time, and this means even more because it's the first-ever Baker's Marketplace."

Opening day was planned with a ribbon cutting, a performance by the University of Nebraska at Omaha dance team with Durango the Maverick, and $25 gift cards for the first 250 customers.

The pharmacy drive-thru and the fuel center fit a pattern. Several features here are built for quick trips by car, and the restaurants going up around the store follow the same idea.

The Plan Drawn Around the Grocery Lot

The corner is part of Kensington Park, a mixed-use development that has been building out in phases for more than 15 years. The City Council approved its first preliminary plat in November 2008, Phase 1 in June 2009, and Phase 2 in December 2023.

The Baker's site is Phase 3. A City of Omaha planning report dated November 26, 2024, describes it as about 20 acres of farm-zoned land at the northwest corner of 204th and Q. The applicant was Western Springs Land Corporation. The plans it submitted show six lots:

  1. A grocery store with a fueling station
  2. A big-box retail store
  3. Two commercial buildings with 46 residential units above them
  4. Several other retail buildings

The report also set aside two more lots for a future Phase 4.

So far, the grocery store and fuel station are the first part of that plan to get an opening date. Restaurants are going up on the lots nearby.

Who Else Is on 205th Street

Business Address Status
Scooter's Coffee Kensington Park, south of the Panda Express site Already open
Baker's Marketplace 5010 S. 205th St. Opening set for Nov. 4, 2026
Panda Express 4815 S. 205th St. Construction began June 2026
Anytime Fitness 19210 Q St. Opening targeted for mid-December 2026
Chick-fil-A 5121 S. 205th St. Opening expected early 2027

Grow Omaha reported in June that construction had started on the Panda Express. The 2,741-square-foot building has a drive-thru and sits north of the existing Scooter's Coffee and northeast of the Baker's store. By October, the Chick-fil-A on the lot in front of Baker's had gone vertical. That October 19 report said it was expected to open "early next year," and it will be the chain's ninth location in the Omaha area.

The gym is a block over. Anytime Fitness plans to open in mid-December in a new 6,000-square-foot space in a retail building at the northwest corner of 192nd and Q. It is locally owned by Brian and Shannon Thomas. They started presales with a community event featuring LOVB Nebraska players Rebekah Allick and Lindsay Krause-Wildeman, according to Grow Omaha.

Eighteen Months of Q Street

All of this was built while one of the main roads to it was closed. Q Street between 192nd and 204th closed for reconstruction in late April 2025. The reopening date kept slipping. In August 2026, WOWT reported that the county engineer blamed delayed utility relocations and weather and said the project was still within its overall finish deadline.

On October 6, 2026, WOWT reported that the stretch had partly reopened after nearly 18 months. Lane restrictions and finishing work remained, and drivers were told to expect delays.

There is a second closure right next to the store. Starting August 31, 2026, Douglas County closed W Q Road from 204th Street to 205th Street for construction "until late fall." That short block connects Q Street to the 205th Street addresses. It was still listed as a full closure in the county's road closures and projects update from October 22.

Segment What happened Latest county or news status
Q St., 192nd to 204th Closed late April 2025 Partly reopened Oct. 6, 2026, with lane restrictions
W Q Rd., 204th to 205th Closed Aug. 31, 2026 Listed closed "until late fall" as of Oct. 22, 2026

A Second Marketplace Already Under Way

The Elkhorn store won't be the only one for long. Baker's broke ground in July 2026 on a second Marketplace at 18303 Evans Street, near 182nd and West Maple, with an opening planned for 2027. The World-Herald reported that the company's combined investment in the two stores is more than $85 million and that the release called them the chain's "most significant expansion in years."

That makes 204th and Q the Marketplace format's first Omaha-area location for at least the rest of 2026. The northern store will open into an area that already has a neighbor under construction. Metro Credit Union is building a 45,000-square-foot headquarters with a retail branch at 17758 Evans Street, southeast of 180th and Maple. Near 204th and Q, the gym opening is targeted for December and the Chick-fil-A for early 2027, and the plan still includes a big-box retailer, the apartment buildings and Phase 4.

At Reid English Group, we follow corners like 204th and Q because new businesses change how a neighborhood works day to day. If you live near 204th and Q and want to know how the new stores and the finished Q Street could affect your home's value, we'd be glad to walk through it with you. Schedule a Consultation.

Find Your Dream Home

Browse active listings in the area or contact us for off-market listings.

Home Search

What's Your Home Worth?

Have an expert help you find out what your home is really worth.

Home Valuation